The Ashes Solo Pack canoe project (21 photos)
Black walnut seat and thwart
Inside work complete
Inside glass
Off the molds
3rd fill coat
Epoxy work complete
Fiber glass draped
Hull faired
hull closed
the last strip
Shaping to closing strip
Picking up the shape of the closing strip
Stripping straight down the keel line
Building break: Taking Ella out for a ride in the Ranger
Stemless construction
Rounding the bilge area
First 2 strips
Beveling tools
Stem beveled and stations set up